construction design
Proper documentation of construction design and consistency within the drawings, reports and specifications are essential to ensure the final quality of the enclosure systems.
facade design manager
assists in the completion of the construction design sets in accordance with the engineering services and performance criteria.
what we offer
design implementation
scope of services
Design and drafting of the architectural set of facade and roof package.
​
Coordination with the related consultants to ensure the reports and specifications are matching with the drawings.
​
Identification of facade and roof systems throughout the project.
​
Coordination and documentation of the interface design.
​
BOQ extraction process.
design modelling
scope of services
3D Modelling of the building enclosure
​
Checking the BIM models to ensure the compliance with the system design and interface design.
​
Review of the BIM models and manage the interface design coordination through BIM environment.
ISTANBUL AIRPORT
Terminal Building
Istanbul, TURKEY
Designed as a transportation hub, Istanbul Airport T1 is among the largest construction projects of the world. Custom designed unitized CWS , stick system CWS . dome skylight systems and modular roof steel structure system with a vaulted ceiling , each being large spanning enclosures are developed in collaboration with teams of designers and engineers which was an intricate process due to design-build concept of the construction,
General view from the conceptual design of the mega aviation project
View from the delivered construction of the terminal building
conceptual design of the apron level facades - view from the airside
General view from the conceptual design of the mega aviation project